本文已被:浏览 4154次 下载 2808次
投稿时间:2011-08-30 修订日期:2011-08-31 录用日期:2011-08-30 网络发布日期:2011-10-26
投稿时间:2011-08-30 修订日期:2011-08-31 录用日期:2011-08-30 网络发布日期:2011-10-26
中文摘要: 通过对铜转炉渣的多元素、物相分析,提出湿法处理工艺。考察物料粒度、初始酸浓度、温度、液固比、浸出时间、搅拌速度、通气速度等因素对铜、钴浸出率的影响。结果表明,采用先筛选粗粒度铜精矿后再硫酸浸出,有利于提高铜回收率,铜的累计回收率达到95%左右,钴与铁的累计回收率达到98%以上。
Abstract:Cobalt and copper were recovered by hydrometallurgy process from copper converter slag after multielement and phase analysis. The effects of particle size, initial sulfuric acid concentration, temperature, ratio of liquid to solid, time, stirring speed, ventilation speed and other factors on leaching rate of copper and cobalt were examined. The results show that total copper recovery rate is over 95%, cobalt and iron total recovery rate is over 98% with sulfuric acid leaching after screening coarsness copper concentrate.
文章编号: 中图分类号: 文献标志码:
基金项目:
| 作者 | 单位 | |
| 刘红斌 | 谦比希铜冶炼有限公司 | lhb0915@sina.com |
| 蒋伟* | 北京矿冶研究总院 | jiangwei@bgrimm.com.cn |
| 蒋训雄 | 北京矿冶研究总院 | |
| 汪胜东 | 北京矿冶研究总院 | |
| 范艳青 | 北京矿冶研究总院 |
| Author Name | Affiliation | |
| LiuHong-bin | Chambishi Copper Smelting Ltd | lhb0915@sina.com |
| JiangWei | jiangwei@bgrimm.com.cn | |
| JiangXun-xiong | ||
| WangSheng-dong | ||
| FanYan-qing |
引用文本:
刘红斌,蒋伟,蒋训雄,汪胜东,范艳青.铜转炉渣湿法回收钴研究[J].有色金属(冶炼部分),2012(2):19-22.
LiuHong-bin,JiangWei,JiangXun-xiong,WangSheng-dong,FanYan-qing.Cobalt Recovery by Hydrometallurgy Process from Copper Converter Slag[J].Nonferrous Metals (Extractive Metallurgy),2012(2):19-22.
刘红斌,蒋伟,蒋训雄,汪胜东,范艳青.铜转炉渣湿法回收钴研究[J].有色金属(冶炼部分),2012(2):19-22.
LiuHong-bin,JiangWei,JiangXun-xiong,WangSheng-dong,FanYan-qing.Cobalt Recovery by Hydrometallurgy Process from Copper Converter Slag[J].Nonferrous Metals (Extractive Metallurgy),2012(2):19-22.

关注微信公众号