本文已被:浏览 3487次 下载 2774次
投稿时间:2011-08-30 修订日期:2011-08-30 录用日期:2011-08-30 网络发布日期:2011-10-26
投稿时间:2011-08-30 修订日期:2011-08-30 录用日期:2011-08-30 网络发布日期:2011-10-26
中文摘要: 研究了磷矿中伴生重稀土的硝酸浸出与萃取。研究了温度、硝酸浓度、时间、液固比等因素对重稀土浸出率的影响。重稀土浸出的适宜条件为:45% HNO3、60 ℃、液固比2.5、浸出时间90 min,此条件下重稀土浸出率达99%、萃取率98.5%、总回收率可达97.5%,磷矿的分解率均大于98%。
Abstract:Leaching and solvent extraction of heavy rare earth elements (HREE) from phosphate rock with nitric acid were studied. The effects of temperature, nitric acid concentration, time, and liquid-to-solid ratio on HREE leaching rate were studied. The optimum conditions for leaching HREE is 45% HNO3, 60 ℃, ratio of liquid to solid is 2.5, leaching time is 90 min. Under these conditions, HREE leaching rate and solvent extraction rate are 99% and 98.5% respectively, and total recovery of HREE is up to 97.5%. The decomposition percentage of phosphate rock is greater than 98%.
文章编号: 中图分类号: 文献标志码:
基金项目:
引用文本:
冯林永,蒋训雄,汪胜东,范艳青,蒋伟,张登高,刘巍.磷矿中伴生重稀土的提取[J].有色金属(冶炼部分),2012(2):34-36.
Feng linyong,Jiang Xunxiong,Wang shengdong,Fan yanqing,Jiangwei,Zhang denggao,Liuwei.Recovery of Heavy Rare Earth Elements from Phosphorite[J].Nonferrous Metals (Extractive Metallurgy),2012(2):34-36.
冯林永,蒋训雄,汪胜东,范艳青,蒋伟,张登高,刘巍.磷矿中伴生重稀土的提取[J].有色金属(冶炼部分),2012(2):34-36.
Feng linyong,Jiang Xunxiong,Wang shengdong,Fan yanqing,Jiangwei,Zhang denggao,Liuwei.Recovery of Heavy Rare Earth Elements from Phosphorite[J].Nonferrous Metals (Extractive Metallurgy),2012(2):34-36.

关注微信公众号