本文已被:浏览 2552次 下载 2354次
投稿时间:2017-11-16 修订日期:2017-11-20 录用日期:2017-11-21 网络发布日期:2018-04-16
投稿时间:2017-11-16 修订日期:2017-11-20 录用日期:2017-11-21 网络发布日期:2018-04-16
中文摘要: 对湿法炼锌废渣经焙烧和酸浸后得到的酸浸渣进行氯盐浸出提取银和铅。考察NaCl浓度、液固比、浸出温度、浸出时间对浸出过程的影响。最佳浸出条件为:NaCl浓度250 g/L、液固比5︰1、反应温度80~100 ℃、反应时间3~4 h。在最佳条件下,Ag、Pb的浸出率分别为94.7%和81%。氯盐循环浸出3次效果较好,Ag的浓度达到139 mg/L,浸出率93.84%,Pb浸出率为81.23%。
Abstract:Chloride leaching was applied to extract Ag and Pb from acid-leaching residues of zinc hydrometallurgy slag after roasting and acid leaching. The effects of NaCl concentration, L/S, leaching temperature, and leaching time on leaching of Ag and Pb were investigated. The results show that leaching rate of Ag and Pb is 94.7% and 81% respectively under the optimum conditions including NaCl concentration of 250 g/L, L/S=5︰1, leaching temperature of 80~100 ℃, and leaching time of 3~4 h. The optimum chloride recycle leaching time is three-cycle, after which silver content in leaching solution is 139 mg/L, leaching rate of Ag and Pb is 93.84% and 81.23% respectively.
文章编号: 中图分类号:TF832 文献标志码:
基金项目:广东省科技计划项目(2015A020215018,2017B090907026);广东省自然科学基金项目(2016A030313801);广东省科学院院属骨干科研机构创新能力建设专项项目(2017GDASCX-0110)
引用文本:
高丽霞,戴子林,张魁芳,刘志强.从湿法锌冶炼废渣中提取银和铅[J].有色金属(冶炼部分),2018(5):29-32.
GAO Lixia,DAI Zilin,ZHANG Kuifang,LIU Zhiqiang.Extraction of Silver and Lead from Slag of Zinc Hydrometallurgy[J].Nonferrous Metals (Extractive Metallurgy),2018(5):29-32.
高丽霞,戴子林,张魁芳,刘志强.从湿法锌冶炼废渣中提取银和铅[J].有色金属(冶炼部分),2018(5):29-32.
GAO Lixia,DAI Zilin,ZHANG Kuifang,LIU Zhiqiang.Extraction of Silver and Lead from Slag of Zinc Hydrometallurgy[J].Nonferrous Metals (Extractive Metallurgy),2018(5):29-32.

关注微信公众号