###
有色金属(冶炼部分):2016,(8):6-11
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
酸性矿坑水用于紫金山铜矿生物堆浸的研究及应用
林泓富
(紫金矿业集团股份有限公司)
Study and Application of Acid Mine Drainage for Zijin Mountain Copper Bio-heap Leaching
LIN Hong-fu
(Zijin Mining Group Co Ltd)
摘要
图/表
参考文献
相似文献
本文已被:浏览 2399次   下载 2779次
投稿时间:2016-02-25     修订日期:2016-03-05     录用日期:2016-03-07     网络发布日期:2016-07-21
中文摘要: 采用酸性矿坑水(AMD)对紫金山低品位次生硫化铜矿开展生物浸出试验,进行了萃余液与硐坑水探索试验,开展了不同温度、不同浸出工艺、不同浸出过程pH、日喷淋时间等对矿石铜和铁浸出率的影响试验。采用硐坑水喷淋工业生产全年稳定运行,各项工艺指标稳定,2014年总计从硐坑水中回收2 241.9 t铜。
Abstract:Acid mine drainage (AMD) was used to leach low grade secondary copper sulfide of Zijin Mountain in bio-heap leaching process. Effects of temperature, leaching method, pH value, and daily spray time on leaching rate of copper and iron were investigated applying raffinate and acid mine drainage, respectively. The results show that production index of copper bio-heap leaching with acid mine drainage is steady. Copper is recovered by 2 241.9 tons from acid mine drainage in 2014.
文章编号:     中图分类号:    文献标志码:
基金项目:国家自然科学基金资助项目(51474075)
Author NameAffiliationE-mail
LIN Hong-fu Zijin Mining Group Co Ltd zijinlinz@163.com 
引用文本:
林泓富.酸性矿坑水用于紫金山铜矿生物堆浸的研究及应用[J].有色金属(冶炼部分),2016(8):6-11.
LIN Hong-fu.Study and Application of Acid Mine Drainage for Zijin Mountain Copper Bio-heap Leaching[J].Nonferrous Metals (Extractive Metallurgy),2016(8):6-11.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号