中文摘要: 祥光铜业有限公司一期20万t阴极铜项目已稳定运行近4年。2011年熔炼系统停炉冷修,同时进行二期45万t阴极铜项目扩产改造。经过50天冷修和扩产改造后,熔炼系统投料试生产,生产运行稳定正常,标志着二期项目顺利实现达产达标。本文重点介绍二期扩产改造项目及试生产情况。
Abstract:The first stage 200 kt/a cathode copper project has been running for nearly four years in Xianggang Copper Co., Ltd. In 2011, the smelting system was shut down for furnace cold repair and reconstruction of the second stage 450 kt/a cathode copper project. The smelting system was put into pilot production after 50-day cold repair and reconstruction. The normal and stable operation of the second stage project marks its successful reach of the targets. The reconstruction and pilot production of this project is introduced.
文章编号: 中图分类号: 文献标志码:
基金项目:
| Author Name | Affiliation |
| GE Zhe-ling | Xiangguang Copper Co., Ltd, Yanggu 252327, Shandong, China |
引用文本:
葛哲令.祥光熔炼二期扩产改造与试生产总结[J].有色金属(冶炼部分),2013(2):43-45.
GE Zhe-ling.Summary on Reconstruction and Pilot Production of Second Stage Project in Xiangguang Copper[J].Nonferrous Metals (Extractive Metallurgy),2013(2):43-45.
葛哲令.祥光熔炼二期扩产改造与试生产总结[J].有色金属(冶炼部分),2013(2):43-45.
GE Zhe-ling.Summary on Reconstruction and Pilot Production of Second Stage Project in Xiangguang Copper[J].Nonferrous Metals (Extractive Metallurgy),2013(2):43-45.

关注微信公众号