中文摘要: 贵冶新30万吨闪速炉C路线自投产以来,故障率高,严重影响到闪速炉的正常生产。针对存在的问题,年修期间对C路线进行了改造,为闪速炉的正常生产提供了保障。
Abstract:Normal production was seriously disrupted by high stoppage rate of route C since No.2 flash furnace of Guixi Smelter was put into production. Route C was transformed in annual examination with the aim to solve the existing problems. The transformation guarantees normal production of flash furnace.