中文摘要: 随着贵冶三期挖潜改造工程的实施,余热锅炉对流部入口出现了烟尘粘结,严重影响了闪速炉的正常作业,利用2003年年度大修时机,对闪速炉余热锅炉进行了相应的改造,取得了很好的效果。
Abstract:Along with the third-stage reconstruction has been put in practice in Guixi smelter, there are some problems caused by dust deposit at the entrance of convection section of the waste-heat boiler, thus greatly impacting normal production of flash furnace. It has made good effect after the reconstruction of the waste-heat boiler during heavy repair period from Dec.2003 to Jan.2004.
文章编号: 中图分类号:TF811 文献标志码:
基金项目:
陈先斌
江西铜业集团公司贵溪冶炼厂,江西贵溪335424
陈先斌' target='_blank'>CHEN Xian-bin
引用文本:
陈先斌.贵冶闪速炉余热锅炉改造[J].有色金属(冶炼部分),2005(1):43-45.
.Reconstruction of Waste-heat Boiler of Flash Furnace in Guixi Smelter[J].Nonferrous Metals (Extractive Metallurgy),2005(1):43-45.