中文摘要: 针对金隆闪速炉冷修的具体内容,提出了采用反应塔预先装配、试压、砌筑,再分段平移就位的施工方案,从而达到缩短工期、减少停产损失的目的。
Abstract:Be aimed at concrete contents of FF cooling repair, this paper put forward a construction project that adopt pre-assemble, try to press, pave and build, and then cent segment is even to move to take seat of respond the tower. There by Jinlong attains the purpose of shortening work period and reducing loss in stop production.