###
有色金属(冶炼部分):2002,(4):8-9,36
本文二维码信息
码上扫一扫!
锌精馏过程中锌精馏铅塔的烟气系统诊断研究
Diagnosis and Study about Smoke System in Lead Column in the Course of Zinc Refining
摘要
图/表
参考文献
相似文献
本文已被:浏览 2193次   下载 19次
              
中文摘要: 对烟气系统的阻力进行了理论计算及测试,结果发现,锌精馏铅塔气系统中烟囱抽力不够。最后,提出了一些合理建议,为锌精馏铅塔烟气系统的改造提供依据。
Abstract:In order to ensure normal work of smoke system in lead column in the course of zinc refining , academic calculation and measure about the resistance of smoke system are carried through The results of study reveal that drawing out force of chimney is inadequate, which is mainly caused by longer rump flue Finally, some reasonable advices are brought forward, which will give rebuilding of smoke system in lead column in the course of zinc refining reliable basis
文章编号:     中图分类号:TF813    文献标志码:
基金项目:国家计委高技术产业示范工程基金 ( 2 0 0 0 1884 )
张全  何金桥  鄂加强  蔡军林 [1]中南大学应用物理及热能工程系,长沙410083 [2]韶关冶炼厂,韶关512024
引用文本:
张全,何金桥,鄂加强,蔡军林.锌精馏过程中锌精馏铅塔的烟气系统诊断研究[J].有色金属(冶炼部分),2002(4):8-9,36.
.Diagnosis and Study about Smoke System in Lead Column in the Course of Zinc Refining[J].Nonferrous Metals (Extractive Metallurgy),2002(4):8-9,36.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号