###
有色金属(冶炼部分):2023,(4):8-13
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
铜冶炼烟尘选择性湿法脱砷及有价元素的同步回收
迟晓鹏1,2, 许佳妍1,2, 翁威1,2, 谭文1,2, 衷水平1,2,3
(1.福州大学紫金地质与矿业学院;2.福建省新能源金属绿色提取与高值利用重点实验室;3.紫金矿业集团股份有限公司)
Selective Wet Removal of Arsenic and Simultaneous Recovery of Valuable Elements from Copper Smelting Dust
摘要
图/表
参考文献
相似文献
本文已被:浏览 1878次   下载 2304次
投稿时间:2022-11-24     修订日期:2022-12-05     录用日期:2022-12-06     网络发布日期:2023-03-17
中文摘要: 针对铜冶炼系统含砷烟尘中砷难以高效富集和脱除的问题,采用水浸-碱浸两步浸出工艺进行脱砷研究。结果表明:含砷烟尘先在液固比1︰1的条件下常温水浸,然后在NaOH浓度2 mol/L、Na2S浓度0.2 mol/L、温度70 ℃、液固比4︰1的条件下碱浸,最终砷的浸出率为95.61%,浸出渣含砷量小于0.5%,铜、铁、锌、铅的浸出率分别为0.01%、0.02%、6.21%和10.77%。
中文关键词: 砷  浸出  铜冶炼  含砷烟尘
Abstract:Address to difficulty to efficient enrichment and removal of arsenic from arsenic-bearing dust in copper smelting system, a two-step leaching process of water leaching and alkali leaching of arsenic removal from arsenic-bearing dust was studied. The results show that final arsenic leaching rate is 95.61% and arsenic content in leaching slag is less than 0.5%, and the leaching rate of Cu, Fe, Zn and Pb is 0.01%, 0.02%, 6.21% and 10.77%, respectively, when the arsenic-bearing dust is leached by water at room temperature with ratio of liquid to solid of 1︰1 and then alkali leached under the conditions including NaOH concentration of 2 mol/L, Na2S concentration of 0.2 mol/L, temperature of 70 ℃, and ratio of liquid to solid of 4︰1.
文章编号:     中图分类号:    文献标志码:
基金项目:国家重点研发计划项目(2022YFC3900804);国家自然科学基金资助项目(52274349,51874101)
引用文本:
迟晓鹏,许佳妍,翁威,谭文,衷水平.铜冶炼烟尘选择性湿法脱砷及有价元素的同步回收[J].有色金属(冶炼部分),2023(4):8-13.
CHI Xiao-peng,XU Jia-yan,WENG Wei,TAN Wen,ZHONG Shui-ping.Selective Wet Removal of Arsenic and Simultaneous Recovery of Valuable Elements from Copper Smelting Dust[J].Nonferrous Metals (Extractive Metallurgy),2023(4):8-13.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号