本文已被:浏览 1878次 下载 2304次
投稿时间:2022-11-24 修订日期:2022-12-05 录用日期:2022-12-06 网络发布日期:2023-03-17
投稿时间:2022-11-24 修订日期:2022-12-05 录用日期:2022-12-06 网络发布日期:2023-03-17
中文摘要: 针对铜冶炼系统含砷烟尘中砷难以高效富集和脱除的问题,采用水浸-碱浸两步浸出工艺进行脱砷研究。结果表明:含砷烟尘先在液固比1︰1的条件下常温水浸,然后在NaOH浓度2 mol/L、Na2S浓度0.2 mol/L、温度70 ℃、液固比4︰1的条件下碱浸,最终砷的浸出率为95.61%,浸出渣含砷量小于0.5%,铜、铁、锌、铅的浸出率分别为0.01%、0.02%、6.21%和10.77%。
Abstract:Address to difficulty to efficient enrichment and removal of arsenic from arsenic-bearing dust in copper smelting system, a two-step leaching process of water leaching and alkali leaching of arsenic removal from arsenic-bearing dust was studied. The results show that final arsenic leaching rate is 95.61% and arsenic content in leaching slag is less than 0.5%, and the leaching rate of Cu, Fe, Zn and Pb is 0.01%, 0.02%, 6.21% and 10.77%, respectively, when the arsenic-bearing dust is leached by water at room temperature with ratio of liquid to solid of 1︰1 and then alkali leached under the conditions including NaOH concentration of 2 mol/L, Na2S concentration of 0.2 mol/L, temperature of 70 ℃, and ratio of liquid to solid of 4︰1.
keywords: arsenic leaching copper smelting arsenic-bearing dust
文章编号: 中图分类号: 文献标志码:
基金项目:国家重点研发计划项目(2022YFC3900804);国家自然科学基金资助项目(52274349,51874101)
引用文本:
迟晓鹏,许佳妍,翁威,谭文,衷水平.铜冶炼烟尘选择性湿法脱砷及有价元素的同步回收[J].有色金属(冶炼部分),2023(4):8-13.
CHI Xiao-peng,XU Jia-yan,WENG Wei,TAN Wen,ZHONG Shui-ping.Selective Wet Removal of Arsenic and Simultaneous Recovery of Valuable Elements from Copper Smelting Dust[J].Nonferrous Metals (Extractive Metallurgy),2023(4):8-13.
迟晓鹏,许佳妍,翁威,谭文,衷水平.铜冶炼烟尘选择性湿法脱砷及有价元素的同步回收[J].有色金属(冶炼部分),2023(4):8-13.
CHI Xiao-peng,XU Jia-yan,WENG Wei,TAN Wen,ZHONG Shui-ping.Selective Wet Removal of Arsenic and Simultaneous Recovery of Valuable Elements from Copper Smelting Dust[J].Nonferrous Metals (Extractive Metallurgy),2023(4):8-13.

关注微信公众号