###
有色金属(冶炼部分):2019,(4):47-51
本文二维码信息
码上扫一扫!
复杂金精矿浸铜渣预处理工艺
王瑞祥,杨裕东,方壮,陈芳会,袁远亮,曾斌,郭跃东,徐志峰
(1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院,1.江西理工大学冶金与化学工程学院)
Pre-treatment of Copper Leaching Residue of Complex Gold Concentration
Wang Ruixiang,Yang Yudong,Yuan Yuanliang,Chen Fanghui,Fang Zhuang,Zeng Bin,Guo Yuedong and Xu Zhifeng
(1.School of Materials and Chemical Engineering,Jiangxi University of Science and Technology,,,,,,,)
摘要
图/表
参考文献
相似文献
本文已被:浏览 2203次   下载 1855次
投稿时间:2018-12-12     修订日期:2018-12-15     录用日期:2018-12-17     网络发布日期:2019-03-19
中文摘要: 对复杂金精矿浸铜渣硫酸和氟化氢铵预处理工艺进行研究,考察了硫酸与氟化氢铵摩尔浓度比值(RS/A)、摩尔浓度、反应液固比、反应时间、反应温度、搅拌速度对金银提取率的影响。结果表明,RS/A和硫酸与氟化氢铵摩尔浓度是影响金银提取率的关键因素,在RS/A=1/1,其摩尔浓度值升高,金、银的提取率可以得到显著提高。浸铜渣经预处理后,包裹物遭到破坏,出现蜂窝状孔隙,硅含量由原来的33.28%降低到5.49%。最佳预处理条件:RS/A=1/1、摩尔浓度值1.5 mol/L、反应液固比5︰1、反应时间2 h、反应温度298 K、搅拌速度250 r/min。氰化条件:反应液固比4︰1、pH=10.5、氰化钠浓度4‰、搅拌速度300 r/min、反应时间72 h、反应温度298 K,此条件下,金、银的提取率分别为98.20%、95.77%,氰化残渣中金、银含量分别小于1.3 g/t、50 g/t。
Abstract:Vitriol and ammonium hydrogen fluoride pre-treatment process of copper leaching residue of complex gold concentrate was studied. Effects of molar concentration ratio of sulfuric acid and ammonium hydrogen fluoride (RS/A), molar concentration, L/S, reaction time, reaction temperature, and stirring speed on extraction rate of gold and silver were investigated. The results show that RS/A and molar concentration of sulfuric acid and ammonium hydrogen fluoride are the key factors impacting extraction rate of gold and silver. When RS/A=1/1, extraction rate of gold and silver can be improved significantly with increase of molar concentration of sulfuric acid and ammonium hydrogen fluoride. Inclusions of copper leaching residue are destructed and honeycomb ?pores appear, and silicon content drops from 33.28% to 5.49% in pre-treatment process. The optimum pretreatment conditions include RS/A=1/1, molar concentration of sulfuric acid and ammonium hydrogen fluoride of 1.5 mol/L, L/S=5/1, reaction time of 2 h, reaction temperature of 298 K, and stirring speed of 250 r/min. Cyanidation conditions include L/S=4/1, pH value of 10.5, sodium cyanide concentration of 4‰, stirring speed of 300 r/min, reaction time of 72 h, and reaction temperature of 298 K. Extraction rate of gold and silver is 98.20% and 95.77% respectively under the above-mentioned conditions, and content of gold and silver in cyanide residue is less than 1.3 g/t and 50 g/t respectively.
文章编号:     中图分类号:    文献标志码:
基金项目:国家自然科学基金资助项目(51564021);江西省自然科学基金资助项目(20151BAB206028)
引用文本:
王瑞祥,杨裕东,方壮,陈芳会,袁远亮,曾斌,郭跃东,徐志峰.复杂金精矿浸铜渣预处理工艺[J].有色金属(冶炼部分),2019(4):47-51.
Wang Ruixiang,Yang Yudong,Yuan Yuanliang,Chen Fanghui,Fang Zhuang,Zeng Bin,Guo Yuedong,Xu Zhifeng.Pre-treatment of Copper Leaching Residue of Complex Gold Concentration[J].Nonferrous Metals (Extractive Metallurgy),2019(4):47-51.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号