本文已被:浏览 2004次 下载 1841次
投稿时间:2017-10-11 修订日期:2017-10-11 录用日期:2017-10-16 网络发布日期:2018-02-11
投稿时间:2017-10-11 修订日期:2017-10-11 录用日期:2017-10-16 网络发布日期:2018-02-11
中文摘要: 介绍了铜阳极泥预处理碲化亚铜渣沉淀工艺优化和改进方法。探索试验结果表明,采用“碲化亚铜渣还原—铜粉置换”新工艺,碲沉淀率由90%提高至98%以上,铜粉用量由理论量2倍降至1.35倍。应用实践证明,该工艺综合经济效益显著,可实现溶液中碲的高效回收。
Abstract:Precipitation process optimization and improvement method of pretreatment of cuprous telluride sludge with copper anode sludge were introduced. The experimental results show that precipitation rate of tellurium rises from 90% to 98% above and dosage of copper powder drops from twice to 1.35 times of theoretical quantity by applying new process of reduction of cuprous telluride slag and replacement with copper powder. Plant practice proves that this new process has comprehensive economic benefit and can achieve high recovery of tellurium in solution.
文章编号: 中图分类号: 文献标志码:
基金项目:福建省科学计划区域发展项目(2015H4017);国家自然科学基金资助项目(51474075)
| 作者 | 单位 | |
| 王俊娥* | 厦门紫金矿冶技术有限公司 | wangjune07@163.com |
| 张焕然 | 紫金铜业有限公司 | |
| 衷水平 | 紫金铜业有限公司 | |
| 陈杭 | 厦门紫金矿冶技术有限公司 | |
| 吕旭龙 | 福州大学紫金矿业学院 |
| Author Name | Affiliation | |
| WANG Jun-e | Xiamen Zijin Mining and Technology Co,LtdXiamen,Fujian,China | wangjune07@163.com |
| ZHANG Huan-ran | ||
| ZHONG Shui-ping | ||
| CHEN Hang | ||
| LV Xu-long |
引用文本:
王俊娥,张焕然,衷水平,陈杭,吕旭龙.碲化亚铜沉淀工艺优化及生产实践[J].有色金属(冶炼部分),2018(3):45-48.
WANG Jun-e,ZHANG Huan-ran,ZHONG Shui-ping,CHEN Hang,LV Xu-long.Process Optimization and Plant Practice of Cuprous Telluride Precipitation[J].Nonferrous Metals (Extractive Metallurgy),2018(3):45-48.
王俊娥,张焕然,衷水平,陈杭,吕旭龙.碲化亚铜沉淀工艺优化及生产实践[J].有色金属(冶炼部分),2018(3):45-48.
WANG Jun-e,ZHANG Huan-ran,ZHONG Shui-ping,CHEN Hang,LV Xu-long.Process Optimization and Plant Practice of Cuprous Telluride Precipitation[J].Nonferrous Metals (Extractive Metallurgy),2018(3):45-48.

关注微信公众号