本文已被:浏览 2307次 下载 2369次
投稿时间:2017-06-27 修订日期:2017-06-28 录用日期:2017-06-28 网络发布日期:2017-10-31
投稿时间:2017-06-27 修订日期:2017-06-28 录用日期:2017-06-28 网络发布日期:2017-10-31
中文摘要: 采用湿法工艺处理卡尔多炉炉渣,回收有价金属铅、铋。考察了盐酸浓度、氯化钠浓度、温度、液固比及时间对氯化浸出的影响。结果表明,在液固比5、盐酸浓度1 mol/L、氯化钠浓度300 g/L、浸出时间2 h、浸出温度70 ℃的较优条件下,铋、铅浸出率分别达到98.53%、90.22%;经中和、置换、酸洗后,得到海绵铅铋中铅铋含量可达94.73%。
Abstract:Kaldo Furnace slag was treated by wet-process to extract Pb and Bi. Effects of concentration of hydrochloric acid, concentration of sodium chloride, leaching temperature, ratio of liquid to solid, and time on chloride leaching were investigated. The results show that leaching rate of Bi and Pb is 98.53% and 90.22% respectively under the optimum conditions including concentration of hydrochloric acid of 1 mol/L, concentration of sodium chloride of 300 g/L, L/S of 5, leaching temperature of 70 ℃, and leaching duration of 2 h. Content of Pb and Bi in sponge alloy is 94.73% after neutralization, replacement and acidic washing.
keywords: chloride leaching lead bismuth Kaldo Furnace slag
文章编号: 中图分类号: 文献标志码:
基金项目:福建省区域重大项目(2015H4017)
| 作者 | 单位 | |
| 张永锋* | 紫金铜业有限公司 | 18005971668@sina.cn |
| 张焕然 | 紫金铜业有限公司 | |
| 衷水平 | 紫金铜业有限公司 | zhongshuiping01@163.com |
| 刘建强 | 紫金铜业有限公司 | |
| 林家永 | 紫金铜业有限公司 | |
| 童樟樟 | 紫金铜业有限公司 |
| Author Name | Affiliation | |
| ZHANG Yong-feng | Zijin Copper Co.,Ltd. | 18005971668@sina.cn |
| ZHANG Huan-ran | ||
| ZHONG Shui-ping | zhongshuiping01@163.com | |
| LIU Jian-qiang | ||
| LIN Jia-yong | ||
| TONG Zhang-zhang |
引用文本:
张永锋,张焕然,衷水平,刘建强,林家永,童樟樟.卡尔多炉熔炼渣提取铅铋工艺研究[J].有色金属(冶炼部分),2017(11):21-24.
ZHANG Yong-feng,ZHANG Huan-ran,ZHONG Shui-ping,LIU Jian-qiang,LIN Jia-yong,TONG Zhang-zhang.Study on Extraction of Lead & Bismuth from Kaldo Furnace Smelting Slag[J].Nonferrous Metals (Extractive Metallurgy),2017(11):21-24.
张永锋,张焕然,衷水平,刘建强,林家永,童樟樟.卡尔多炉熔炼渣提取铅铋工艺研究[J].有色金属(冶炼部分),2017(11):21-24.
ZHANG Yong-feng,ZHANG Huan-ran,ZHONG Shui-ping,LIU Jian-qiang,LIN Jia-yong,TONG Zhang-zhang.Study on Extraction of Lead & Bismuth from Kaldo Furnace Smelting Slag[J].Nonferrous Metals (Extractive Metallurgy),2017(11):21-24.

关注微信公众号