本文已被:浏览 2213次 下载 2468次
投稿时间:2016-01-17 修订日期:2016-01-19 录用日期:2016-01-20 网络发布日期:2016-04-18
投稿时间:2016-01-17 修订日期:2016-01-19 录用日期:2016-01-20 网络发布日期:2016-04-18
中文摘要: 采用喷淋量约80 m3/d的间歇性喷淋(喷一天,隔一天再喷)方法对某铀矿微生物堆浸尾渣进行铀的生物浸出,试验持续了49 d,液固比为0.49,尾渣的铀浸出率达到了4.62%,浸出液铀浓度均大于50 mg/L。该方法有效解决了堆浸后期矿石中残留铀难以浸出且浸出效率低下的问题,提高了单位溶浸液平均铀浸出浓度。
Abstract:Uranium heap leached tailings have been microbial heap leached for 49 days with spray quantity of 80 m3/d and L/S=0.49 by intermittent spraying as one day on and one day off. Uranium leaching rate is 4.62% with uranium concentration in solution of 50 mg/L above. This method effectively addresses difficulty of uranium leaching and low leaching efficiency in later period of heap leaching, and improves uranium concentration in unit leaching solution.
文章编号: 中图分类号: 文献标志码:
基金项目:国家科技部国际合作项目(2011DFR60830);江西省教育厅科技项目(GJJ12392)
| Author Name | Affiliation | |
| HUA Guo-huan | East China institute of Technologe | huaguohuan123@163.com |
| SUN Zhan-xue | ||
| LI Jiang | ||
| LIU Ya-jie |
引用文本:
华国欢,孙占学,李江,刘亚洁.铀矿尾渣微生物堆浸试验[J].有色金属(冶炼部分),2016(5):26-28.
HUA Guo-huan,SUN Zhan-xue,LI Jiang,LIU Ya-jie.Test of Microbial Heap Leaching of Uranium Tailings[J].Nonferrous Metals (Extractive Metallurgy),2016(5):26-28.
华国欢,孙占学,李江,刘亚洁.铀矿尾渣微生物堆浸试验[J].有色金属(冶炼部分),2016(5):26-28.
HUA Guo-huan,SUN Zhan-xue,LI Jiang,LIU Ya-jie.Test of Microbial Heap Leaching of Uranium Tailings[J].Nonferrous Metals (Extractive Metallurgy),2016(5):26-28.

关注微信公众号