本文已被:浏览 2383次 下载 2776次
投稿时间:2014-02-28 修订日期:2014-03-11 录用日期:2014-03-12 网络发布日期:2014-07-21
投稿时间:2014-02-28 修订日期:2014-03-11 录用日期:2014-03-12 网络发布日期:2014-07-21
中文摘要: 对再生铅的脱硫预处理结合短窑熔炼工艺进行全面的数据调研,并对各个工序的铅物质流进行了核算,明确了铅在各种物料中的分配量,并整理成物质流平衡图,在此基础上进行了污染负荷的计算和评价。结果表明,铅污染主要来自短窑熔炼工序炉渣和铅尘的排放。
Abstract:The comprehensive data of secondary lead desulfurization pre-treatment and smelting in short kiln smelting were investigated. Lead material flow on each process was checked. The distribution volume of lead in various materials was determined and organized into material flow diagram. Pollution load was calculated and evaluated based on this diagram. The results show that lead pollution mainly come from discharging of slag and lead dust in smelting process of short kiln smelting.
文章编号: 中图分类号: 文献标志码:
基金项目:环保部公益性行业科研专项(201209014)
| 作者 | 单位 | |
| 万文玉* | 湖南有色金属研究院 | hynwwy@163.com |
| Author Name | Affiliation | |
| Wan Wenyu | HunanSResearchSInstituteSforSNonferrousSMetals | hynwwy@163.com |
引用文本:
万文玉.再生铅冶炼过程铅物质流核算及污染负荷分析[J].有色金属(冶炼部分),2014(8):66-69.
Wan Wenyu.Lead Material Flow Checking and Pollution Load Analysis of Secondary Lead Smelting Process[J].Nonferrous Metals (Extractive Metallurgy),2014(8):66-69.
万文玉.再生铅冶炼过程铅物质流核算及污染负荷分析[J].有色金属(冶炼部分),2014(8):66-69.
Wan Wenyu.Lead Material Flow Checking and Pollution Load Analysis of Secondary Lead Smelting Process[J].Nonferrous Metals (Extractive Metallurgy),2014(8):66-69.

关注微信公众号