本文已被:浏览 2307次 下载 2945次
投稿时间:2013-05-21 修订日期:2013-05-23 录用日期:2013-05-24 网络发布日期:2013-10-25
投稿时间:2013-05-21 修订日期:2013-05-23 录用日期:2013-05-24 网络发布日期:2013-10-25
中文摘要: 采用NH3-NH4Cl-H2O体系柱浸方法浸出氧化锌矿。结果表明,在矿石粒度为0.1~10 mm、双柱串联操作、第一柱中填料2 629 g、第二柱填料1 314 g、总氨浓度7.5 mol/L、NH4Cl/NH3=2∶1、浸出液循环喷淋30 d条件下,锌浸出率达到92.19 %,浸出液中锌离子浓度达到54.38 g/L。与瓶浸结果相比,柱浸工艺锌浸出率提高约4个百分点,浸出液中Zn2 浓度提高约11 g/L。
中文关键词: 氧化锌矿 NH3-NH4Cl-H2O体系 柱浸
Abstract:Zinc oxide ore was column leached in NH3-NH4Cl-H2O system. The results show that the leaching rate of zinc is 92.19% and zinc ion concentration in leachate is 54.38 g/L under the conditions including ore particle size of 0.1~10 mm, double column series operation, ore loading in first column of 2 629 g and 1 314 g in second column, total ammonia concentration of 7.5 mol/L, NH4Cl/NH3=2∶1, and leaching time of 30 days. Compared with the results of bottle leaching, zinc leaching rate of column leaching is improved by about 4 percent point and zinc ion concentration in leachate is improved by about 11 g/L.
文章编号: 中图分类号: 文献标志码:
基金项目:国家自然科学基金资助项目(51164011);国家高技术研究发展计划(863计划)项目(2013AA064001);福建省区域科技重大合作项目(2011H4025)
| 作者 | 单位 | |
| 王瑞祥 | 江西理工大学 冶金与化学工程学院 | wrx9022@163.com |
| 余攀* | 江西理工大学 冶金与化学工程学院 | yupan0321@163.com |
| 曾斌 | 江西理工大学 冶金与化学工程学院 | zengbin1101@163.com |
| 王志刚 | 中国瑞林工程技术有限公司 | |
| 阮建国 | 中国瑞林工程技术有限公司 |
引用文本:
王瑞祥,余攀,曾斌,王志刚,阮建国.NH3-NH4Cl-H2O体系氧化锌矿柱浸试验研究[J].有色金属(冶炼部分),2013(11):4-6.
Wang Rui-xiang,Yu Pan,Zeng Bin,Wang Zhi-gang,Ruan Jian-guo.Column Leaching of Zinc Oxide Ore in NH3-NH4Cl-H2O System[J].Nonferrous Metals (Extractive Metallurgy),2013(11):4-6.
王瑞祥,余攀,曾斌,王志刚,阮建国.NH3-NH4Cl-H2O体系氧化锌矿柱浸试验研究[J].有色金属(冶炼部分),2013(11):4-6.
Wang Rui-xiang,Yu Pan,Zeng Bin,Wang Zhi-gang,Ruan Jian-guo.Column Leaching of Zinc Oxide Ore in NH3-NH4Cl-H2O System[J].Nonferrous Metals (Extractive Metallurgy),2013(11):4-6.

关注微信公众号