本文已被:浏览 3141次 下载 2451次
投稿时间:2011-12-12 修订日期:2011-12-13 录用日期:2011-12-13 网络发布日期:2012-05-31
投稿时间:2011-12-12 修订日期:2011-12-13 录用日期:2011-12-13 网络发布日期:2012-05-31
中文摘要: 研究了湿法炼锌副产铜渣的综合利用新工艺。最佳浸出条件为:液固比10∶1,浸出温度80 ℃,浸出剂(硫酸)浓度3.5 mol/L,浸出时间8 h。浸出液含铜浓度达到30~45 g/L,铜浸出率可以达到98%以上。经萃取、洗涤、三级错流反萃后,反萃液中铜浓度达到45~50 g/L,电积后可以得到标准阴极铜。
Abstract:The new comprehensive utilization technology of copper slag by-product in zinc hydrometallurgy was investigated. The optimal leaching conditions including ratio of liquid to solid of 10∶1, leaching temperature of 80 ℃, leaching agent (sulfuric acid) concentration of 3.5 mol/L, and leaching time of 8 h. The copper concentration in lixivium reaches 30~45 g/L, and the copper leaching rate is higher than 98%. The copper concentration in stripping solution reaches 45~50 g/L after extraction, washing and three-stage cross-flow stripping of copper. The cathode copper can be produced with electrowinning process.
文章编号: 中图分类号: 文献标志码:
基金项目:
| 作者 | 单位 | |
| 鲁兴武* | 西北矿冶研究院冶金新材料研究所 | luxingwu_007@163.com |
| 邵传兵 | 西北矿冶研究院冶金新材料研究所 | 576700665@qq.com |
| 易超 | 西北矿冶研究院冶金新材料研究所 | |
| 李俞良 | 西北矿冶研究院冶金新材料研究所 |
引用文本:
鲁兴武,邵传兵,易超,李俞良.湿法炼锌副产铜渣的综合利用[J].有色金属(冶炼部分),2012(6):17-18.
Lu Xingwu,Shao Chuanbing,Yi Chao,Li Yuliang.Comprehensive Utilization of Copper Slag By-product in Zinc Hydrometallurgy[J].Nonferrous Metals (Extractive Metallurgy),2012(6):17-18.
鲁兴武,邵传兵,易超,李俞良.湿法炼锌副产铜渣的综合利用[J].有色金属(冶炼部分),2012(6):17-18.
Lu Xingwu,Shao Chuanbing,Yi Chao,Li Yuliang.Comprehensive Utilization of Copper Slag By-product in Zinc Hydrometallurgy[J].Nonferrous Metals (Extractive Metallurgy),2012(6):17-18.

关注微信公众号