本文已被:浏览 2234次 下载 24次
中文摘要: 简要阐述金隆公司35万t熔炼挖潜改造及电解工程中转炉实现3H2B操作与控制的方式,对控制、工艺装备等进行了说明.
Abstract:The operation and controlling of 3H2B by using converter were briefly introduced in the 350 kt/a smelting and potentiality exploitation in Jinlong company.The controlling and technology equipments were also explained.
文章编号: 中图分类号:TF811 文献标志码:
基金项目:
程宾
金隆铜业有限公司,铜陵,244021
?
程宾' target='_blank'>CHENG Bing
Jinlong Copper Co.;Ltd;Tongling 244021;China
引用文本:
程宾.转炉3H2B操作与控制优化方式[J].有色金属(冶炼部分),2009(2):.
.The Operation and Eminent Controlling of 3H2B for Converter[J].Nonferrous Metals (Extractive Metallurgy),2009(2):.
程宾.转炉3H2B操作与控制优化方式[J].有色金属(冶炼部分),2009(2):.
.The Operation and Eminent Controlling of 3H2B for Converter[J].Nonferrous Metals (Extractive Metallurgy),2009(2):.

关注微信公众号