本文已被:浏览 2640次 下载 16次
中文摘要: 概述了金隆转炉余热锅炉运行中出现的问题。详细介绍金隆转炉余热锅炉受热面、振打装置、循环系统的改造方案及改造后的实际运行效果。
Abstract:The problems accompanied by running of the waste heat boiler are summarized.The reconstruction of the boiler's heating areas,vibrating instrument,recycling system and the reconstruction effects are also introduced in detail.
文章编号: 中图分类号:TF811 文献标志码:
基金项目:
引用文本:
柴满林,徐伟年.金隆转炉余热锅炉改造[J].有色金属(冶炼部分),2007(2):43-45.
.Reconstruction of Jinlong Copper''''s Waster Heat Boiler[J].Nonferrous Metals (Extractive Metallurgy),2007(2):43-45.
柴满林,徐伟年.金隆转炉余热锅炉改造[J].有色金属(冶炼部分),2007(2):43-45.
.Reconstruction of Jinlong Copper''''s Waster Heat Boiler[J].Nonferrous Metals (Extractive Metallurgy),2007(2):43-45.

关注微信公众号