###
有色金属(冶炼部分):2005,(4):16-19
本文二维码信息
码上扫一扫!
金隆铜冶炼设备改造及技术进步
Technology Progress and Equipment Reconstruction of Jinlong Copper Flash Smelting
摘要
图/表
参考文献
相似文献
本文已被:浏览 2730次   下载 19次
              
中文摘要: 介绍金隆公司投产以来整个生产系统主要设备改造情况,重点介绍2005年闪速炉和辅助设施的改造,以及通过不断技术进步,使生产能力和各项技术经济指标有了大幅度提高。
中文关键词: 闪速炼铜  年修  设备改造  技术进步
Abstract:The main technology progress and equipment reconstruction of the whole production line since the start-up of Jinlong smelter are introduced in detail, and the equipment reconstruction of Flash Furnace and assistant establishment are also emphasized. By the continuous technology progress and self-innovation, both the production capability and technical and economical index are greatly improved.
文章编号:     中图分类号:TF811    文献标志码:
基金项目:
昂正同 金隆铜业有限公司,安徽铜陵244021
昂正同' target='_blank'>ANG Zheng-tong
引用文本:
昂正同.金隆铜冶炼设备改造及技术进步[J].有色金属(冶炼部分),2005(4):16-19.
.Technology Progress and Equipment Reconstruction of Jinlong Copper Flash Smelting[J].Nonferrous Metals (Extractive Metallurgy),2005(4):16-19.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号