###
有色金属(冶炼部分):2005,(1):32-35
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
闪速炉处理高Pb、Zn、As精矿的探讨
Inquisition on Smelting High Pb, Zn, As Concentrate in Flash Furnace
摘要
图/表
参考文献
相似文献
本文已被:浏览 2223次   下载 18次
              
中文摘要: 闪速炉处理铅、锌、砷等杂质含量较高的精矿时出现了炉况较大的波动,沉淀池粘渣厚;沉淀池侧壁、上升烟道喉口部及侧壁、废热锅炉入口等处出现结瘤;冲渣水沟堵塞漫水等一系列问题。对出现此类问题的原因进行了分析,采取了相应的防范措施,得到了预期的效果。
中文关键词: 铜精矿  闪速炉  粘渣  上升烟道  结瘤
Abstract:When smelting concentrate containing high impurities such as Pb, Zn, As, flash furnace suffered fluctuation in furnace condition, thick sticky slag layer in settler, accretion formation on settler wall, uptake throat and boiler entrance. Additionally, the groove of granulation circulation water is easy to be built up with water flooding. This paper analyzes factors causing the above troubles, and presents the corresponding precautions to them as well as the results expected.
文章编号:     中图分类号:TF811    文献标志码:
基金项目:
昂正同 金隆铜业有限公司,安徽铜陵244021
昂正同' target='_blank'>ANG Zheng-tong
引用文本:
昂正同.闪速炉处理高Pb、Zn、As精矿的探讨[J].有色金属(冶炼部分),2005(1):32-35.
.Inquisition on Smelting High Pb, Zn, As Concentrate in Flash Furnace[J].Nonferrous Metals (Extractive Metallurgy),2005(1):32-35.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号