本文已被:浏览 2713次 下载 15次
中文摘要: 提出了高铁闪锌矿加压酸浸新工艺。结果表明,高铁闪锌矿一段加压酸浸时锌浸出率大于95%,二段加压浸出时锌浸出率大于98%;二段加压浸出能够实现锌和铁的选择性浸出。降低浸出液酸度。
Abstract:The new leaching technology, i.e. acid leaching under pressure, that is used on high iron containing sphalerite, is introduced. The test results show the zinc leached rate in first step is more than 95%, and it is more than 98% on the second step, so the two step leaching process can achieve the following targets: zinc and iron leached selectivity and reduce the acidity of the leaching solution.
文章编号: 中图分类号:TF813 文献标志码:
基金项目:
引用文本:
王吉坤,周廷熙,吴锦梅.高铁闪锌矿精矿加压酸浸新工艺研究[J].有色金属(冶炼部分),2004(1):5-8.
.Study on High Iron Containing Sphalerite Concentrate by Acid Leaching under Pressure[J].Nonferrous Metals (Extractive Metallurgy),2004(1):5-8.
王吉坤,周廷熙,吴锦梅.高铁闪锌矿精矿加压酸浸新工艺研究[J].有色金属(冶炼部分),2004(1):5-8.
.Study on High Iron Containing Sphalerite Concentrate by Acid Leaching under Pressure[J].Nonferrous Metals (Extractive Metallurgy),2004(1):5-8.

关注微信公众号