本文已被:浏览 2174次 下载 27次
中文摘要: 分析了影响烟化法提锌过程的决定因素,从保证还原能力和提高作业温度等方面介绍强化烟化过程、增加吹炼炉数来提高烟化炉处理量的措施。
中文关键词: 处理量 烟化炉 空气过剩系数 锌冶金
Abstract:The factors effected the zinc extracting during the fuming process are analyzed. The measurement, such as strengthening the fuming process and increasing the blowing times, which can improve the fuming furnace capacity is introduced based on ensuring the reducibility and increasing the temperature.
文章编号: 中图分类号:TF813 文献标志码:
基金项目:
引用文本:
原和平,王健.提高烟化炉处理量的途径[J].有色金属(冶炼部分),2003(5):14-17.
.The Way Improving the Fuming Furnace''''s Capacity[J].Nonferrous Metals (Extractive Metallurgy),2003(5):14-17.
原和平,王健.提高烟化炉处理量的途径[J].有色金属(冶炼部分),2003(5):14-17.
.The Way Improving the Fuming Furnace''''s Capacity[J].Nonferrous Metals (Extractive Metallurgy),2003(5):14-17.

关注微信公众号