###
有色金属(冶炼部分):2011,(2):51-54
←前一篇   |   后一篇→
本文二维码信息
码上扫一扫!
贵冶2#闪速炉排烟系统堵塞控制探讨
(江西铜业集团公司贵溪冶炼厂)
Exhaust System Clogging Control of No.2 Flash Smelting Furnace in Guixi Smelter
(JCC Guixi Smelter)
摘要
图/表
参考文献
相似文献
本文已被:浏览 2964次   下载 27次
投稿时间:2010-10-22               
中文摘要: 贵冶2#闪速炉自投产以来,排烟系统堵塞现象经常发生,严重影响铜酸系统满负荷作业。分析了排烟系统堵塞形成的原因,并提出了解决排烟系统堵塞的措施。
中文关键词: 铜  闪速炉  排烟  堵塞
Abstract:The clogging in exhaust system had often occurred seriously since the operation of No.2 flash smelting furnace in Guixi Smelter. It resulted affecting the copper acid system operating at full capacity. The reason for the formation of exhaust system blockage was analyzed, and the measurement to solve the exhaust system blockage was proposed.
keywords: Copper  Flash Furnace  Smoke  Block
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
杨永丰 杨辉华.贵冶2#闪速炉排烟系统堵塞控制探讨[J].有色金属(冶炼部分),2011(2):51-54.
YANG Yong-feng, YANG Hui-hua.Exhaust System Clogging Control of No.2 Flash Smelting Furnace in Guixi Smelter[J].Nonferrous Metals (Extractive Metallurgy),2011(2):51-54.

我们一直在努力打
造,精品期刊,传
播学术成果

全国咨询服务热线
86-10-63299752/63299758

联系我们

电话:010-63299752/63299758

传真:010-63299744

QQ:XXXXXXX

Email:ysyl@bgrimm.com

邮编:100160

地址:北京市南四环西路188号总部基地18区23号楼

关注微信公众号